Blog

March 17, 2023

Yazar: ZTF Jeotermal Boru

What You Need to Know About Pre-Insulated Pipe Installation

İçindekiler

  • 1 How is the Pre-Insulated Pipe Installation Performed?
  • 2 Excavation Work
  • 3 Installation of Steel Service Pipe
  • 4 Splice Octane Insulation
  • 5 Frequently Asked Questions About Pre-Insulated Pipe Installation
    • 5.1 Why is pre-insulated pipe installation important?
    • 5.2 How should excavation works be carried out?
    • 5.3 What standards should be followed for the installation of steel service pipe?
    • 5.4 How to assemble the joining set?
    • 5.5 What tests should be performed after the assembly process?

How is the Pre-Insulated Pipe Installation Performed?

The correct installation of pipelines is very important for a solid structure and safe operation. In particular, the installation of steel service pipes must be carried out in accordance with certain standards. In this article, we will tell you what you need to know about pre-insulated pipe installation.

Excavation Work

The floor in the installation area should be made suitable. Unsound floors should be made suitable for pipe installation and 10 cm of sand should be placed under the pipeline. If it is on watery floors, it is necessary to drain the ground water.

Installation of Steel Service Pipe

Welding of steel service pipes must be carried out in accordance with the EN 287-1 standard. In addition, radiographic examination should be performed in accordance with EN 444 and EN 1435 standards.

Splice Octane Insulation

For pre-insulated pipe installation, the coupling set should be passed over the outer sheath housing pipe. After the steel service pipe welding is completed and the tests are carried out, the surfaces on which the joining set will come should be cleaned with solvent or alcohol.

The joining set should be placed centered so that it is superimposed on the steel pipe sheath by a minimum of 10 cm. The surfaces of the joining set and the pre-insulated package pipe to be wrapped with heat shrink tape should first be cleaned with solvent or alcohol, then sanded with a wire brush until the gloss disappears.

After the sanded surface is heated with the help of purmuz, heat shrink tapes should be applied to the heated surfaces for sealing purposes using purmuz. In cases where the ambient temperature drops below +10°C and rises above +40°C, heat shrink tapes should be wrapped.

After the installation process is completed, sealing tests should be performed and the assembly of the coupling set should be completed with polyurethane injection. Octane insulation can also be done with a heat shrink joint set.

The installation of pre-insulated pipes must be carried out in accordance with certain standards. It is important to follow the following steps for correct installation:

  1. Ground preparation: The unsound parts of the ground under the pipeline should be made suitable. For this purpose, leveling should be carried out by laying at least 10 cm of sand under the pipeline. If it is on watery floors, the ground water should definitely be drained.
  2. Welding process: The welding of the steel service pipe must be carried out in accordance with the welding technique and the EN 287-1 standard. The radiographic examination must comply with EN 444 and EN 1435.
  3. Installation of the assembly set: The joining kit should be placed centered so that it is superimposed at least 10 cm on the steel pipe sheath, and the surfaces to be wrapped with heat shrink tape should first be cleaned with solvent or alcohol, then sanded with a wire brush until the gloss is gone. After the sanded surface is heated with the help of purmuz, heat shrink tapes should be applied to the heated surfaces for sealing purposes using purmuz.
  4. Insulation of the joint: After the assembly process is completed, leakage tests should be performed and the assembly of the joint set should be completed with polyurethane injection. Joint insulation can also be done with a heat shrink joint set.

The correct implementation of these steps ensures that the installation of pre-insulated pipes is carried out correctly and safely.

Frequently Asked Questions About Pre-Insulated Pipe Installation

Why is pre-insulated pipe installation important?

Pre-insulated pipe installation is important to ensure that pipelines are more durable and efficient. Insulation helps to protect the pipes against external factors and increase energy efficiency.

How should excavation works be carried out?

During the excavation works, it is necessary to consolidate the ground. On watery floors, the ground water should be drained and leveling should be done by laying at least 10 cm of sand under the pipeline.

What standards should be followed for the installation of steel service pipe?

In the installation of steel service pipes, welding operations should be performed in accordance with EN 287-1 standard, and radiographic examinations should be performed in accordance with EN 444 and EN 1435 standards.

How to assemble the joining set?

The joining set should be placed centered so that it is superimposed on the steel pipe sheath by a minimum of 10 cm. The surfaces should be cleaned with solvent or alcohol first, then sanded with a wire brush and heated with a brush to ensure sealing with heat shrink tapes.

What tests should be performed after the assembly process?

After the installation process is completed, sealing tests should be performed to test the tightness of the pipelines, and the assembly of the assembly kit should be completed by polyurethane injection.

Bir önceki yazımız olan Fiber Glass Tubes - The Ideal Solution for Strong and Durable Construction başlıklı makalemizde composite pipes, energy pipes ve glass fiber hakkında bilgiler verilmektedir.

Yazıyı değerlendirmek için tıklayın
[Toplam: 1 Ortalama: 5]
Yayınlandı: Pipe Insulation kategorisi altındaEtiketler: combining set, EN 287-1, excavation, Isolation, pre-insulated pipe installation, radiographic examination, steel service pipe, tightness test, welding technique
Önceki
Sonraki

Search

Categories

  • Agricultural Innovations
  • Agricultural Technologies
  • Construction
  • Construction Industry
  • Construction Materials
  • Energy
  • Energy and Agriculture Integration
  • Energy Efficiency
  • Environmentally Friendly Energy Solutions
  • Geothermal Energy
  • Geothermal Pipe
  • Geothermal Power Plants
  • Geothermal Technologies
  • Greenhouse Installation
  • Greenhouse Management
  • Greenhouse materials
  • Heat Insulated Pipe Systems
  • Heat Insulated Pipes
  • Insulation Technology
  • Pipe and Pipe Materials
  • Pipe Calculation Tools
  • Pipe Design and Sizing
  • Pipe Diameter Calculation Methods
  • Pipe Insulation
  • Pipes and Fittings
  • Piping Systems
  • Polyethylene Pipe
  • Renewable Energy Applications
  • Stainless Steel Products
  • Sustainability
  • Thermal Tourism

Recent Posts

Fiber Glass Tubes – The Ideal Solution for Strong and Durable Construction

May 23, 2024

What is Heat Transfer? Click Here To Find Out!

April 26, 2024

Pipe Diameter Calculation: Easy Methods For Accurate Results

January 29, 2024

Tags

  • construction industry
  • energy efficiency
  • energy saving
  • geothermal energy
  • Pipe Insulation
  • pipe insulation
  • renewable energy
  • steel pipe
  • sustainability
  • sustainable energy

ZTF Jeotermal Boru

(0312) 286 23 33  / (0312) 286 61 11

Merkez Ofis Adres:
Balgat, Oğuzlar Mah, 1393. Sk. No: 13/9, 06190 Ankara

Fabrika Adres:
Afyon Organize Sanayi Bölgesi 4. Cadde 3. Sokak No :10, 03200

[email protected] / [email protected]

Faydalı Linkler

  • Ürünlerimiz
  • Referanslarımız
  • Blog
  • Hakkımızda
  • Sıkça Sorulan Sorular

Sosyal Medya Hesapları

ZTF Jeotermal Boru – Ön İzolasyonlu Boru Çözümleri © 2025 Tüm Hakları Saklıdır.

Ara